Skip to content
boxes.craftgen · fit check

Service clearance · 1:1

Will it fit? Check it with clearances before delivery

The fridge arrived. The doors hit the wall.

Open fit check

Estimate ±2–5 cm. Measure with a tape before installing.

01 · Where clearances come from

Service clearances from the manual — in AR, at real size

Every clearance has a source: a page of the manufacturer’s manual with a quote, or a clause of the Ukrainian building code (DBN). Swipe through the products, switch states, tap a clearance — you’ll see where the number comes from.

02 · Live 3D

The same page you’ll open on site

Rotate with a finger, switch “closed / in use”. Scroll the page outside the frame.

AR via the button inside: iPhone opens Quick Look, Android opens Scene Viewer, no scaling. The boiler goes on the wall — vertical placement.

03 · Honest accuracy

±2–5 cm

It’s an estimate, not a measurement. With LiDAR — ±1–2 cm. If you step back, the model can drift by 5–25 cm. AR answers “does it fit and where does the clearance reach”; measure with a tape before installing.

A4 fit sheet for the boiler: 0–20 cm ruler, plan and elevation with clearances to scale, QR
A4 sheet for checking. 0–20 cm ruler — make sure the printer didn’t change the scale. Plan and elevation with clearances at 1:10; the QR opens the fit check on a phone. Boiler A4 sheet, PDF ↗

04 · On site

Four steps at the niche

  1. Open the fit check for the product on your phone — or point the camera at the QR on the A4 sheet.
  2. Pick a state: closed, doors at 90°, casing removed — each has its own clearance.
  3. AR: tap the floor or wall where the centre of the product will be.
  4. See what the clearance runs into — a wall, a cabinet, the room door. Then the tape measure.

05 · For dealers

A “Check installation clearances” button on the product page

Product card · example

Wall-hung gas combi boiler

Vaillant ecoTEC plus 832 · 440 × 720 × 352 mm

Buyers see the clearances before they order. The button loads 3D only after a click.

<script src="https://boxes.craftgen.app/embed.js" async></script>
<button type="button" data-showgen-button="f/<id>" data-state="open">Check installation clearances</button>

<id> — from a fit check created on the “Upload model” page.

Next step

Your product isn’t in the catalogue?

Upload a model — .dae (SketchUp), .glb, .obj, .stl up to 30 MB: pick the front and you get the same page with clearances, AR and an A4 sheet. In SketchUp 2017+ the showgen installation-clearances extension does it.

Upload model ↗

Check before delivery, not after

Open fit check

Estimate ±2–5 cm. Measure with a tape before installing.
The fit check interface is in Ukrainian for now.

Skip to content
boxes.craftgen.app / fit check

Service clearance · AR 1:1

Will it fit? Check it with clearances before delivery

The fridge arrived. The doors hit the wall.

Service clearances from the manual — in AR, at real size. Boiler, fridge, server cabinet: every number comes with a page reference or a clause of the Ukrainian building code (DBN).

Open fit check

Estimate ±2–5 cm.
Measure with a tape before installing.

01 · Bench

Three products. Every clearance has a source

Left — a diagram built from the passport numbers: what applies in this state and why. Right — the live fit check page, the same one the buyer or installer will open.

Product service clearances
SidemmTypeSource

Loading the fit check page…

· rotate with mouse or finger, switch states; AR from a phone via the QR on the A4 sheet. Open in full ↗

02 · Honest accuracy

±2–5 cm — an estimate, not a measurement

With LiDAR (iPhone Pro) — ±1–2 cm. If you step back, the model can drift by 5–25 cm. Browser AR answers “does it fit and where does the clearance reach” — it doesn’t replace a tape measure.

  • AR without scaling: iPhone — Quick Look, Android — Scene Viewer; the boiler goes on the wall, vertical placement.
  • States: closed / in use — doors at 90° and fully open, casing removed, cabinet doors open. One AR file per state.
  • The stricter one wins: if a side has both a manufacturer figure and a code requirement, the larger number is drawn; the other is in the clearance card.
A4 fit sheet for the boiler: 0–20 cm ruler, plan and elevation with clearances to scale, QR
A4 sheet for checking. 0–20 cm ruler — to check the printer didn’t change the scale; plan and elevation with clearances at 1:10 (if it doesn’t fit — 1:20…1:50, scale labelled); the QR opens the fit check on a phone. Put it in the order folder. Boiler, PDF Fridge, PDF Rack, PDF

03 · For dealers

A button on the product page: “won’t fit” before the order, not after

Product card · example

Wall-hung gas combi boiler

Vaillant ecoTEC plus 832 · wall-mounted

Two lines on the product page. 3D doesn’t load until the buyer clicks; on iPhone the AR button opens the full page, on Android it goes straight to Scene Viewer.

<script src="https://boxes.craftgen.app/embed.js" async></script>
<button type="button" data-showgen-button="f/<id>" data-state="open">
  Check installation clearances
</button>

<id> — from a fit check created on the “Upload model” page; for the catalogue demo — fit/vaillant-ecotec-plus-832.

04 · From office to niche

How it works on an order

  1. 01Open the fit check for a catalogue product or your own.
  2. 02Print the A4 — a plan with clearances and a QR for the installer.
  3. 03On site — AR: tap the floor or wall where the centre of the product will be.
  4. 04Clearance blocked? You see it before delivery. Then the tape measure.

Next step — your own model. .dae (SketchUp), .glb, .obj, .stl up to 30 MB → pick the front → the same page with clearances, AR and an A4 sheet. In SketchUp 2017+ — the showgen installation-clearances extension, which opens the same page.

Upload model ↗

Check before delivery, not after

Open fit check

Estimate ±2–5 cm. Measure with a tape before installing.
The fit check interface is in Ukrainian for now.